Kitchen renovations in Pietermaritzburg

Your kitchen.Every trade.One contract.

Demolition, plumbing, electrical, tiling, cabinetry and countertops, managed by one contractor across Durban, Pietermaritzburg and KZN.

R65k to R180ktypical full kitchen
3 to 5 wksfull remodel
4.3 ★on Google
AFR-KIT · Kitchen remodelSite record
Kitchen renovation in progress
ScopeKitchen remodel
TradesManaged in-house
RegionKZN
QuoteFixed price
What's included

Every kitchen scope can cover this.

Full kitchen demolition and strip-out
Layout reconfiguration and structural changes
Plumbing relocation and new connections
Electrical and lighting installation
Floor and wall tiling
Cabinetry and built-in cupboard installation
Countertop and sink fitting
Splashback and feature finishes
Painting and final interior finishes
What it costs

A real range. So you can plan.

Guide price

Kitchen renovation

R65k to R180kMost full kitchen renovations in KZN
What moves the price
  • Staying in the footprint or changing the layout
  • Cabinetry and countertop choice
  • Moving plumbing and electrical points
  • Tiling and splashback finishes
Get your fixed price →
★★★★★
"Thank you for such professional and quality work. I'm especially impressed by your communication and your after service follow up."
Mbuso N. · Roof cleaning and repair
4.3 on Google →
Every quote includes
  • A free site visit
  • A written, fixed price
  • Start and finish dates
  • No rework policy: problems fixed at our cost

Guide prices for KwaZulu-Natal in 2026. Your fixed quote follows a site visit and is the only number you pay.

Why one contractor

Five trades. One point of contact.

A kitchen renovation involves more trades than most homeowners expect. Plumbing has to move. Electrical needs reconfiguring. Walls come down or go up. Tiling needs proper surface preparation or it fails within months.

We manage the whole process, so you're not coordinating five contractors who don't talk to each other. One point of contact, one timeline, one sign-off.

  1. 01

    One contractor, every trade

    Plumbing, electrical, tiling, cabinetry and painting coordinated in-house. One number to call.

  2. 02

    A start and a finish date

    Agreed at quote stage and held to. No open-ended renovations.

  3. 03

    CIDB Grade 2GB registered

    General building registration, verifiable on the CIDB register with CRS 10262268.

Questions

Kitchen questions.

How long does a kitchen renovation take?

Typically 3 to 5 weeks for a full remodel. Layout changes and structural work extend the timeline, and we detail this at quote stage.

Can you move plumbing and electrical as part of the renovation?

Yes. We handle plumbing relocation, new connections and electrical reconfiguration in-house.

Do you do commercial kitchen fit-outs as well as residential?

Yes. We build restaurant, guesthouse and catering kitchens to compliance and operational standards.

What is the difference between a kitchen update and a full renovation?

An update replaces surfaces, cabinetry, countertops and tiling without demolition. A full renovation starts from scratch and can include layout changes. We will tell you which one your kitchen actually needs.

Do you supply cabinetry and countertops?

Yes. We can procure and install, or work with a client-supplied joiner. We manage the coordination either way.

Kitchens quote

Start with your kitchen.

Most full kitchens land between R65,000 and R180,000. Your fixed price follows a free site visit.

  • Free site visit and a written, fixed price
  • Start and finish dates agreed upfront
  • No rework policy: problems fixed at our cost
Prefer to talk?069 503 6291033 001 0397 · info@afripact.net★★★★☆ 4.3 on Google
Step 2 of 4Under a minute

What do you need done?

Pick the closest match.

Roughly how big is it?

No measurements needed. We measure on site.

When do you need it done?

This helps us plan the site visit.

Where can we reach you?

Kitchen

Request received.

Afripact gets back to you within one business day.

CallQuote